From:
Year:
Status:
Owner:
Recommendation
Continue to develop a strategy for dealing with environmentally sensitive materials through the design and supply chain process.
History
Status at 31 Mar 2013
Closed
Status at 01 Oct 2012
Closed
Status at 31 Mar 2012
Closed
Status at 31 Dec 2011
Closed
Status at 30 Sep 2011
Closed
Status at 30 Jun 2011
Closed
Status at 31 Dec 2010
Closed
Status at 30 Sep 2010
Closed
Status at 30 Jun 2010
Closed
Status at 31 Dec 2009
Closed
The ODA has developed a Materials Implementation Guide for Project Teams (IGPT). The aim of the guide is to provide guidance in relation to minimising the environmental impact, and maximising the sustainability of materials, through design and procurement to construction and operation of the venues and infrastructure. LOCOG has produced a Sustainable Sourcing Code, which sets out their approach to dealing with environmentally sensitive materials, although we will need to review the application of it when leasing products. London 2012 have developed policy statements on materials/PVC and HFC. The materials policy is to be split from the PVC policy giving a stand alone policy on environmentally sensitive materials Closed (recommendations from the 2008 Annual Review take precedence)