Recommendation
Produce plans for habitat and species management at other venues as part of the VEMP process.
History
Status at 31 Mar 2013
Complete
Status at 01 Oct 2012
Complete
Status at 31 Mar 2012
Complete
Sites have been surveyed where needed, ranging from ecological walkovers to full detailed surveys depending on the nature of the location. This is determined in conjunction with the local Planning department, consultation with relevant bodies and by the determination of the likely impacts of the venue. LOCOG are producing Venue Environment Plans, which will either be adopted by the venue operators or incorporated into their Venue Operating Plans. These will include environmental components, including ecological impacts where relevant. Complete
Status at 31 Dec 2011
Progress Made
Status at 30 Sep 2011
Progress Made
Status at 30 Jun 2011
Progress Made
Status at 31 Dec 2010
Progress Made
Sites are surveyed where appropriate, ranging from ecological walkovers to full detailed surveys depending on the nature of the location. This is determined in conjunction with the local Planning department, consultation with relevant bodies and by the determination of the likely impacts of the venue. LOCOG will produce Venue Environment Plans which will either be adopted by the venue operators or incorporated into their Venue Operating Plans, which will include environmental components, including ecological impacts where relevant. Progress Made
Status at 30 Sep 2010
Progress Made
Status at 30 Jun 2010
Progress Made
Status at 31 Dec 2009
No Evidence Yet
Cannot be assessed until Venue Environment Management Plans are produced No evidence yet