The ODA must ensure that the implications of the emerging legacy waste strategy are reflected in the design and build of the Olympic Village and venues where possible.
History
Status at 31 Mar 2013
Closed
Status at 01 Oct 2012
Closed
Status at 31 Mar 2012
Closed
Status at 31 Dec 2011
Closed
Status at 30 Sep 2011
Closed
Status at 30 Jun 2011
Closed
Status at 31 Dec 2010
Closed
With the absence of a clear legacy waste strategy at present it has been not possible for it to be factored into the design and build of the Olympic Village. Certain elements will be dependant on decisions by the London Borough of Newham and the East London Waste Authority, which may preclude against a unified legacy waste strategy for the whole Olympic Park. In the absence of these, the Olympic Village has been designed on the basis of the general practice in the surrounding boroughs Closed
Status at 30 Sep 2010
Closed
Status at 30 Jun 2010
Closed
Status at 31 Dec 2009
No Evidence Yet
With the absence of a clear legacy waste strategy at present it is difficult to factor them into the design and build of the Olympic Village. Certain elements will be dependant on decisions by the London Borough of Newham and the East London Waste Authority, which may preclude against a unified legacy waste strategy for the whole Olympic Park. No Evidence Yet