235 |
Annual |
2012 |
LOCOG
|
That LOCOG ensures that benchmarks are available for future Games to facilitate more responsible energy use.
Read more
|
Complete |
234 |
Annual |
2012 |
LLDC
|
That the LLDC ensure that the cumulative overall target for 50 per cent (by weight) transport of materials by rail or water is met during ...
Read more
|
Progress Made |
213 |
Annual |
2011 |
GOE
GLA
|
That government and the GLA mandate certification to BS 8901 for all official events.
Read more
|
Progress Made |
212 |
Annual |
2011 |
LLDC
|
That the OPLC [now LLDC] use the LMF protocol, developed in 2008, as a starting point for work to develop the sustainability objectives and plans ...
Read more
|
Closed |
211 |
Annual |
2011 |
GLA
|
That the GLA Group resolves the issue of resources available to support CompeteFor, Diversity Works for London and job brokerage as soon as possible to ...
Read more
|
Closed |
210 |
Annual |
2011 |
LOCOG
|
That LOCOG calculates the carbon that would have been saved through the renewable energy target and demonstrates how this carbon will be saved through reducing ...
Read more
|
Complete |
209 |
Annual |
2011 |
LLDC
|
That the OPLC [now LLDC] confirm their commitment to maintain 45 hectares of habitat that can mature into a Site of Importance for Nature Conservation ...
Read more
|
Complete |
208 |
Annual |
2011 |
ODA
GOE
|
That the ODA, working with relevant government departments, gather evidence of the linkage between productivity, health, safety and sustainability and publish their findings as part ...
Read more
|
Complete |
207 |
Annual |
2011 |
ODA
|
That the ODA evaluate the 'as built' carbon footprints of at least two venues to include the Velodrome and the Aquatic Centre and publish the ...
Read more
|
Complete |
206 |
Annual |
2011 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
That the London 2012 Sustainability Group addresses delivery of the sustainability aspects of the Government legacy plan published in December 2010.
Read more
|
Closed |
205 |
Annual |
2011 |
GLA
|
That City Operations urgently develop a clear set of targets, objectives, plans and procedures to comply with BS 8901 and to meet LOCOG's sustainability standards. ...
Read more
|
Complete |
204 |
Annual |
2011 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
That the London 2012 Sustainability Group should provide clear leadership over all aspects of sustainability (including health) and establish a mechanism to engage effectively with ...
Read more
|
Closed |
184 |
Annual |
2010 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
That there is greater co-ordination of the health agenda across Key Stakeholders, through existing groups, or possibly by establishing a Health Legacy board as part ...
Read more
|
Complete |
183 |
Annual |
2010 |
London 2012 Transport Partners
|
That the cost of public transport to the Games, combined with car park pricing be structured to ensure that travelling to the Games from outside ...
Read more
|
Complete |
182 |
Annual |
2010 |
LLDC
|
That the OPLC work with partners in the local community to ensure the Olympic Park is able to deliver zero carbon energy by 2016.
[This recommendation ...
Read more
|
Progress Made |
181 |
Annual |
2010 |
GOE
|
That GOE work with the rest of Government to ensure that the construction industry develops a consistent and effective approach to carbon management that includes ...
Read more
|
Not Fully Achieved |
180 |
Annual |
2010 |
GOE
|
That GOE work with the rest of DCMS to develop a consistent and effective approach to carbon management for major sporting events.
Read more
|
Not Achieved |
179 |
Annual |
2010 |
London 2012 Sustainability Group
|
That the London 2012 Sustainability Group, with input from relevant stakeholders, define the meaning of a 'blueprint for sustainable living' and develop a work plan ...
Read more
|
Closed |
178 |
Annual |
2010 |
London 2012 Sustainability Group
|
That the current London 2012 Sustainability Group be constituted as a formal legacy board or allocates clear responsibility for the promise to create a 'blueprint ...
Read more
|
Complete |
177 |
Annual |
2010 |
LOCOG
|
That LOCOG continue to explore opportunities with the legacy owners and the sport community to ensure the optimum long term benefit is achieved in lease/buy ...
Read more
|
Closed |
176 |
Annual |
2010 |
LOCOG
|
That LOCOG develop a suite of targets through each governance committee to reflect the emerging development of their priority sustainability strategies and operational programmes. The ...
Read more
|
Complete |
175 |
Annual |
2010 |
LOCOG
|
That LOCOG identify partner organisations with significant sustainability impacts and establish an engagement programme to ensure consistency.
Read more
|
Complete |
174 |
Annual |
2010 |
GOE
|
That GOE incorporate responses to the Commission's recommendations into the overall view of programme risk managed by OPPO.
Read more
|
Complete |
173 |
Annual |
2010 |
London 2012 Sustainability Group
|
That the London 2012 Sustainability Group establish a timely, clear, co-ordinated, funded, independent work programme to capture sustainability lessons learned and to set new standards ...
Read more
|
Closed |
141 |
Annual |
2009 |
GLA
GOE
LDA
LLDC
|
In further developing the programme of leisure, culture and visitor management, the GLA, GOE and LDA [and now also the LLDC] should consider use of ...
Read more
|
Complete |
140 |
Annual |
2009 |
London 2012 Sustainability Group
|
The London 2012 Sustainability Group should ensure that wider aspects of biodiversity are addressed in future updates of the Sustainability Plan. This should include venues ...
Read more
|
Complete |
139 |
Annual |
2009 |
LOCOG
LDA
LLDC
|
LOCOG and the LDA [and now also the LLDC] should ensure that the resources and process to enable local employees and businesses to participate in ...
Read more
|
Complete |
138 |
Annual |
2009 |
ODA
|
The ODA should apply lessons from early projects such as Orient Way and communicate them internally to other project teams and externally to the industry.
Read more
|
Complete |
137 |
Annual |
2009 |
London 2012 Sustainability Group
|
The London 2012 Sustainability Group should ensure that substances with high Global Warming Potential such as HFC are eliminated where possible.
Read more
|
Complete |
136 |
Annual |
2009 |
ODA
|
The ODA must ensure that the implications of the emerging legacy waste strategy are reflected in the design and build of the Olympic Village and ...
Read more
|
Closed |
135 |
Annual |
2009 |
LLDC
|
The LDA [now LLDC] should assess the resources required to embed sustainability into the Legacy Masterplan Framework and to act as an effective client. These ...
Read more
|
Closed |
134 |
Annual |
2009 |
GLA
|
The GLA should develop a simple process to collect reporting information in order to ensure delivery against the Olympic sub-objectives for which they are responsible.
Read more
|
Complete |
133 |
Annual |
2009 |
ODA
LOCOG
|
The ODA and LOCOG should ensure a clear and consistent policy for mitigating the impacts of manufacture, use and disposal of temporary materials.
Read more
|
Complete |
132 |
Annual |
2009 |
LLDC
|
The LDA [now LLDC] should ensure that the Olympic Park infrastructure is able to deliver zero carbon heat and very low carbon energy by 2016 ...
Read more
|
Closed |
131 |
Annual |
2009 |
GLA
HMG
|
The GLA and Government should ensure that the Olympic Park Legacy Company currently under development for legacy has the long term sustainable development of the ...
Read more
|
Closed |
130 |
Annual |
2009 |
London 2012 Sustainability Group
|
The London 2012 Sustainability Group should reduce carbon at source as much as possible and honour the commitment to offset flights for competitors and officials ...
Read more
|
Closed |
129 |
Annual |
2009 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
All users of the London 2012 Brand should be required to demonstrate how they will contribute to the London 2012 Sustainability Plan and relevant objectives.
Read more
|
Not Fully Achieved |
128 |
Annual |
2009 |
London 2012 Sustainability Group
|
The London 2012 Sustainability Group should ensure that the priorities identified in the Sustainability Leadership meeting are delivered through clear strategies, roles and responsibilities across ...
Read more
|
Closed |
127 |
Annual |
2009 |
OBSG
London 2012 Sustainability Group
|
Sustainability should be a standing item for discussion at Olympic Board Steering Group meetings. The London 2012 Sustainability Group should focus on emerging issues that ...
Read more
|
Closed |
82 |
Annual |
2007 |
CSL
|
CSL to review the early development of the draft Legacy Masterplan to ensure it appropriately captures wider and cross-cutting benefits, and that it is appropriate ...
Read more
|
Complete |
81 |
Annual |
2007 |
ODA
LOCOG
|
ODA/LOCOG to clarify how it will implement the commitment to access and mobility for Olympic Park and for temporary venues and temporary overlay.
Read more
|
Closed |
80 |
Annual |
2007 |
LDA
ODA
LOCOG
GOE
|
Develop clearly focused aspirations and targets for numbers of people to be trained, short and long term employment targets with particular reference to equalities.
Read more
|
Closed |
79 |
Annual |
2007 |
LDA
ODA
LOCOG
GOE
|
Ensure that the work of the various agencies operating in the skills and employment area (ODA, LDA, host boroughs, local voluntary sector, local education authorities, ...
Read more
|
Closed |
78 |
Annual |
2007 |
CSL
|
CSL to conduct a review of the LETF process as part of the ongoing work programme.
Read more
|
Complete |
77 |
Annual |
2007 |
CSL
|
CSL to monitor implementation of the equalities and diversity strategy.
Read more
|
Complete |
76 |
Annual |
2007 |
CSL
|
The final ODA Equalities and Diversity strategy has now been issued and the commission will review this as part of a review of social and ...
Read more
|
Complete |
75 |
Annual |
2007 |
LOCOG
|
Make plans for implementation of a Games-time LEZ available after the Beijing Games.
Read more
|
Complete |
74 |
Annual |
2007 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
Ensure that the health benefits of other workstreams are captured. For example, the impact on wellbeing from long term employment offered through the Employment and ...
Read more
|
Closed |
73 |
Annual |
2007 |
LOCOG
ODA
|
Work with food suppliers as early as possible to ensure there is an adequate supply chain to meet the ambitions for healthy, local and sustainable ...
Read more
|
Complete |
72 |
Annual |
2007 |
LOCOG
|
Develop the 2012 programme sustainable food strategy by 2008 with subsequent revisions after the Beijing Games.
Read more
|
Complete |
71 |
Annual |
2007 |
ODA
|
Ensure biodiversity issues are effectively managed in the development of Prescott Lock.
Read more
|
Complete |
70 |
Annual |
2007 |
LOCOG
|
Produce plans for habitat and species management at other venues as part of the VEMP process.
Read more
|
Complete |
69 |
Annual |
2007 |
ODA
LOCOG
|
Set out how biodiversity is incorporated into the design process for venues and other development.
Read more
|
Complete |
68 |
Annual |
2007 |
ODA
LOCOG
|
Develop clear plans for how habitat is to be restored after construction on all sites.
Read more
|
Closed |
67 |
Annual |
2007 |
ODA
LLDC
|
As part of the Legacy Masterplan Framework, clarify what resources will be available and which agency will be responsible for managing the implementation of the ...
Read more
|
Closed |
66 |
Annual |
2007 |
ODA
LOCOG
|
LOCOG should establish dialogue with the utility sponsor (appointed by LOCOG) and the utility partner (appointed by the ODA) in 2008 to understand how the ...
Read more
|
Closed |
65 |
Annual |
2007 |
LOCOG
ODA
|
Define energy targets for temporary venues and other venues requiring temporary overlay.
Read more
|
Closed |
64 |
Annual |
2007 |
ODA
|
Ensure that the ODA energy scheme is developed to utilise alternative fuel sources over time and during legacy.
Read more
|
Closed |
63 |
Annual |
2007 |
ODA
|
Continue the good work to incentivise the Energy Services Company (to be appointed by the ODA) to deliver higher levels of carbon reduction.
Read more
|
Closed |
62 |
Annual |
2007 |
LOCOG
|
Develop a clear communications strategy for the carbon strategy which is transparent about how carbon is to be managed, using terminology that is clear to ...
Read more
|
Complete |
61 |
Annual |
2007 |
LOCOG
|
Set out a timetable for refreshing the strategy to take account of emerging good practice
Read more
|
Complete |
60 |
Annual |
2007 |
LOCOG
|
Develop a proactive approach to linking the carbon strategy to the procurement process.
Read more
|
Complete |
59 |
Annual |
2007 |
OBSG
|
Define how the carbon strategy will be decided and led at an executive level.
Read more
|
Closed |
58 |
Annual |
2007 |
LOCOG
|
Develop a clear definition of the footprint of the Games to include all relevant sources of greenhouse gas emissions that are created as a result ...
Read more
|
Complete |
57 |
Annual |
2007 |
LOCOG
|
Ensure that waste disposal is included in the carbon footprint to encourage prioritisation of re-use over recycling.
Read more
|
Complete |
56 |
Annual |
2007 |
LDA
LLDC
|
The LDA should lead development of a clear vision of waste disposal infrastructure for East London. This should link to opportunities to use waste from ...
Read more
|
Closed |
55 |
Annual |
2007 |
LOCOG
|
Develop a strategy and standards for temporary overlay and temporary venues.
Read more
|
Closed |
54 |
Annual |
2007 |
ODA
LOCOG
|
Continue to develop a strategy for dealing with environmentally sensitive materials through the design and supply chain process.
Read more
|
Closed |
53 |
Annual |
2007 |
LOCOG
|
Develop a programme for minimisation and disposal of Games time waste in a manner that achieves the 'zero landfill' objective and stimulates investment in facilities ...
Read more
|
Closed |
52 |
Annual |
2007 |
CSL
|
CSL to review waste as a thematic review and comment further on roles and responsibilities.
Read more
|
Complete |
51 |
Annual |
2007 |
CSL
|
CSL to review the local skills and employment process as part of a thematic review in the current year with recommendations for scalability.
Read more
|
Complete |
50 |
Annual |
2007 |
CSL
|
CSL to review legacy arrangements in more detail in the next Governance Review.
Read more
|
Complete |
49 |
Annual |
2007 |
GLA
|
Allocate clear responsibility roles for delivery plans and a process for the necessary parties to approve and agree plans.
Read more
|
Closed |
48 |
Annual |
2007 |
GLA
|
Ensure that succession planning, recruitment and induction of members of the Olympic team delivers people with a sound knowledge of regional government in London and ...
Read more
|
Closed |
47 |
Annual |
2007 |
GLA
|
Develop the reporting structure to fully address the achievement of delivery plan requirements.
Read more
|
Closed |
46 |
Annual |
2007 |
GLA
|
Complete the planned revisions to the delivery plans to describe how accountability for the Olympic Objectives will be disseminated, delivered and reported.
Read more
|
Closed |
45 |
Annual |
2007 |
GLA
|
Ensure that the process to communicate delivery plan content to people who need to know is progressed. The joint GLA/LDA programme group needs to be ...
Read more
|
Closed |
44 |
Annual |
2007 |
GLA
|
Clarify that the role of delivery plans is to achieve the Olympic Objectives agreed by the Olympic Board. It may be necessary to update them ...
Read more
|
Closed |
43 |
Annual |
2007 |
GOE
|
Develop a detailed reporting process related to the PSA objectives and the role of CSL in providing assurance.
Read more
|
Complete |
42 |
Annual |
2007 |
GOE
|
Ensure that recruitment and induction of relationship managers continues to deliver people with a sound knowledge of government and skills in using networks to achieve ...
Read more
|
Closed |
41 |
Annual |
2007 |
GOE
|
Develop a reporting structure that relates to the achievement of Legacy Action Plan requirements.
Read more
|
Complete |
40 |
Annual |
2007 |
GOE
GLA
|
Complete the planned development of Legacy Action Plans by DCMS and GLA to describe how accountability for the Olympic Objectives will be disseminated, delivered and ...
Read more
|
Complete |
39 |
Annual |
2007 |
LOCOG
|
Develop a Sustainability Management System that delivers adequate assurance in the absence of an ISO 14001 system and takes into account the requirements of BS ...
Read more
|
Complete |
38 |
Annual |
2007 |
LOCOG
|
Demonstrate commitment to SD principles by embedding SD into job descriptions, objectives, recruitment and personal development plans.
Read more
|
Complete |
37 |
Annual |
2007 |
LOCOG
|
Demonstrate how SD is being embedded into contractual commitments and into the process for measuring results in relation to sponsorship arrangements generally and in relation ...
Read more
|
Complete |
36 |
Annual |
2007 |
LOCOG
|
Ensure that Functional Area Business plans address clear SD targets, activities and outcomes in the next draft
Read more
|
Closed |
35 |
Annual |
2007 |
LOCOG
|
Demonstrate significant progress in developing the following strategic plans over the next 12 months:
• Food strategy to incorporate local, sustainable, healthy options which also minimise ...
Read more
|
Complete |
34 |
Annual |
2007 |
LOCOG
|
Publish specific SD objectives and targets.
Read more
|
Closed |
33 |
Annual |
2007 |
ODA
|
Clarify objectives and responsibilities and targets for temporary venues and overlay.
Read more
|
Closed |
32 |
Annual |
2007 |
ODA
|
Ensure that shortage of information on legacy use of facilities does not preclude the business case for sustainable options by working with a range of ...
Read more
|
Closed |
31 |
Annual |
2007 |
ODA
|
Ensure that the recommendations highlighted in this report and in the emerging Legacy Masterplan Framework are taken into account in procurement specifications and design briefs ...
Read more
|
Closed |
30 |
Annual |
2007 |
ODA
|
Demonstrate commitment to SD principles by embedding SD into job descriptions, bonuses, objectives, recruitment and personal development plans, induction and training.
Read more
|
Complete |
29 |
Annual |
2007 |
ODA
|
Focus on recruitment of long term staff to support this agenda and procurement of resources required to support through service contracts and consultancy. Propose clear ...
Read more
|
Complete |
28 |
Annual |
2007 |
ODA
|
Ensure that sub-project specific plans contain detailed SD targets using guidance and co-ordination from the SD team. Summarise detailed targets and objectives to act as ...
Read more
|
Complete |
27 |
Annual |
2007 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
Key Stakeholders to work with CSL to establish a pragmatic and meaningful reporting process.
Read more
|
Complete |
26 |
Annual |
2007 |
GOE
CSL
|
Clarify how reporting and verification of performance data will take place now that OPSU has been disbanded.
Read more
|
Complete |
25 |
Annual |
2007 |
LOCOG
|
Build on the development of the London 2012 Sustainability Plan to describe how the wider strategic and legacy objectives related to the five key themes ...
Read more
|
Complete |
24 |
Annual |
2007 |
GOE
OBSG
|
Implement the appointment of the nominated senior executive from OBSG to lead the SD agenda and ensure early engagement with key issues such as carbon ...
Read more
|
Complete |
23 |
Annual |
2007 |
GOE
GLA
|
Complete the planned development of co-ordinated Legacy Action Plans by GOE and GLA to describe how accountability for the Olympic Objectives will be disseminated, delivered ...
Read more
|
Complete |
22 |
Annual |
2007 |
GOE
|
GOE to update the programme brief document and ensure the principles and relevant content is communicated as part of the induction process for new staff ...
Read more
|
Closed |
21 |
Annual |
2007 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
Ensure that recruitment and succession plans are in place to provide continuity for key roles.
Read more
|
Closed |
20 |
Annual |
2007 |
CSL
|
The commission should undertake a review based on the ODA internal audit report into design to ensure that SD issues have been dealt with appropriately.
Read more
|
Complete |
19 |
Annual |
2007 |
CSL
|
The commission should undertake a further review of commercial arrangements as part of its ongoing work plan.
Read more
|
Complete |
18 |
Annual |
2007 |
LOCOG
|
The contribution made by sustainability partners should be clearly communicated through various media, including a section of the London 2012 website which also reports their ...
Read more
|
Closed |
17 |
Annual |
2007 |
ODA
LOCOG
|
ODA and LOCOG should develop a clear plan to collect information about labour standards in the supply chains of commercial partners and suppliers and, more ...
Read more
|
Closed |
16 |
Annual |
2007 |
CSL
|
The commission should conduct a further review of legacy arrangements and plans as part of its ongoing work plan in 2009 and should carry out ...
Read more
|
Closed |
15 |
Annual |
2007 |
CSL
|
The commission should review, in 2009, the arrangements to deliver healthy and diverse sustainable food with linkages to opportunities to improve health and social/economic sustainability.
Read more
|
Complete |
14 |
Annual |
2007 |
CSL
|
The commission should review, in 2008, the processes, infrastructure and resources to maximise the social and economic sustainability opportunities presented by the Games.
Read more
|
Complete |
13 |
Annual |
2007 |
LDA
LLDC
|
The LDA should lead the development of a clear vision of waste disposal infrastructure for East London. This should link to opportunities to use waste ...
Read more
|
Closed |
12 |
Annual |
2007 |
OBSG
|
OBSG should consider the options for carbon management associated with the Games based on the current study. This should be followed by clear communication of ...
Read more
|
Closed |
11 |
Annual |
2007 |
ODA
LOCOG
|
LOCOG should establish dialogue with the utility sponsor (appointed by LOCOG) and the utility partner (appointed by the ODA) in 2008 to understand how the ...
Read more
|
Closed |
10 |
Annual |
2007 |
CSL
London 2012 Sustainability Group
|
The commission should establish a work programme with the London 2012 Sustainability Group to define how the commission will receive and act on SD performance ...
Read more
|
Complete |
9 |
Annual |
2007 |
London 2012 Sustainability Group
|
London 2012 Sustainability Group to develop appropriate SD reporting processes to cover all aspects of the London 2012 programme.
Read more
|
Complete |
8 |
Annual |
2007 |
ODA
LOCOG
|
ODA and LOCOG should clearly set out their proposals for developing management systems (SMS) to cover all aspects of SD which will be subject to ...
Read more
|
Complete |
7 |
Annual |
2007 |
LOCOG
|
The full requirements of the London 2012 Sustainability Plan (SP) as they apply to LOCOG should be fully embedded in the next round of functional ...
Read more
|
Closed |
6 |
Annual |
2007 |
ODA
|
Clear and specific SD objectives and targets should be embedded in ODA sub-project plans, with associated personal objectives, recruitment and training to ensure appropriately skilled ...
Read more
|
Complete |
5 |
Annual |
2007 |
ODA
LOCOG
GLA
GOE
LDA
LLDC
|
Succession plans are put in place for all key positions essential to the delivery of SD outcomes. Also see recommendation 3.
Read more
|
Closed |
4 |
Annual |
2007 |
ODA
LOCOG
|
ODA and LOCOG should develop a clear statement of intent with respect to standards for temporary venues and temporary overlay.
Read more
|
Closed |
3 |
Annual |
2007 |
OBSG
London 2012 Sustainability Group
|
OBSG, through the London 2012 Sustainability Group, should establish cross-cutting workstreams to deliver the strategic aspirations described by the five key themes and other significant ...
Read more
|
Closed |
2 |
Annual |
2007 |
CSL
GLA
GOE
|
The commission should conduct a formal review of the two Legacy Action Plans as part of its ongoing programme of work. GLA and DCMS should ...
Read more
|
Closed |
1 |
Annual |
2007 |
CSL
|
The commission's 2008 governance review should have a particular focus on the arrangements to stage the Games and deliver a sustainable legacy nationally
Read more
|
Complete |