Commission for a Sustainable London 2012 » stadium http://www.cslondon.org Mon, 25 Mar 2013 16:33:32 +0000 en-US hourly 1 http://wordpress.org/?v=3.4 Commission publishes Post-Games Report http://www.cslondon.org/2012/11/commission-publishes-post-games-report/ http://www.cslondon.org/2012/11/commission-publishes-post-games-report/#comments Wed, 14 Nov 2012 23:44:02 +0000 jemmapercy http://www.cslondon.org/?p=2663 Read more ]]> The Commission for a Sustainable London 2012 has published its in-depth review into whether the London 2012 Olympic and Paralympic Games truly delivered the promised levels of sustainability.

The post-Games report, entitled London 2012 – From Vision to Reality, presents the final conclusions through key sustainability themes, with information based on first-hand observations and data gathered by the Commission during Games-time.

The report concludes that the London 2012 Games broadly delivered against its sustainability objectives, and highlights several examples of leading practice which the Commission urges future Olympic and Paralympic organisers to follow.

Using today’s release of its post-Games report, the Commission has called on the UK to lead the charge in ensuring London’s lessons are firmly embedded into the events industry.

Ambitious sustainability targets such as zero waste to landfill and 70% waste to be re-used, recycled or composted are on track thanks to efforts such as meticulous attention to packaging and the effective use of the colour coded three-bin system.

The transport system delivered an excellent service, and London 2012 should be praised for being the first Games to offer a fully comprehensive mobility service. Comprehensive public transport options and effective planning meant that the logistical operation for the Games was delivered with minimal disruption to Londoners.

Another success story was the food, with a wide variety of healthy, sustainably sourced, affordable meals available at most London 2012 venues, driven from the start by the development of the impressive London 2012 ‘Food Vision’ – a first for major event catering.

Shaun McCarthy, Chair of the Commission for a Sustainable London 2012, said:

“I have no hesitation in confirming that London 2012 has delivered the most sustainable Games ever, and we congratulate the delivery bodies and all those who contributed to this excellent achievement. But we mustn’t rest on our laurels – more could be achieved if London’s lessons, both the good and the challenging, are heeded by others.

“London 2012 has raised the bar on sustainability, not just for future Olympic and Paralympic Games but for industry, and for the organisers of major events the world over – from music festivals to football World Cups. By being open to learning from these successes as well as the missed opportunities, future major projects could even out-perform London 2012’s sustainability achievements.

“Minister for Sport Hugh Robertson has said that Government is now ‘focused on delivering the legacy from the Games’. The UK is hosting the Commonwealth Games in 2014, the Rugby World Cup in 2015, and the Olympic Stadium hosting the World Athletics Championships in 2017 – what better way to deliver the legacy than by embedding leading sustainability practice in these events? I call on the organisers to pick up the sustainability baton and carry it forward, demonstrating to the UK public that we can rely on them to meet the spirit of London’s sustainability achievements.”

However, the Commission’s findings also point to some areas during the London 2012 Games where further improvements could have been made.

The Live Sites provided an excellent opportunity for the public to soak up the Games atmosphere for free, but the Commission was disappointed that many of the Live Sites refused to allow the public to bring in their own food; compromising affordability and the principle of creating an event for all budgets.

Although Games-time carbon savings are on track to be achieved, the Commission remains disappointed with LOCOG’s slow development of a comprehensive energy plan, which meant opportunities were missed for even further carbon reductions.

The opening and closing ceremonies provided a showcase for messages about sustainability, and elements such as the method of waste management on the Olympic Park and use of green space offered spectators an opportunity to observe sustainability in practice. However, the lack of information available about the venues, village buildings and infrastructure was a missed opportunity for communicating their sustainability credentials to visitors.

The post-Games report can be downloaded in PDF format here.  

The full press release about the report is available here.  

 

]]>
http://www.cslondon.org/2012/11/commission-publishes-post-games-report/feed/ 0
Commission statement on Stadium Wrap announcement http://www.cslondon.org/2011/08/commission-statement-on-stadium-wrap-announcement/ http://www.cslondon.org/2011/08/commission-statement-on-stadium-wrap-announcement/#comments Thu, 04 Aug 2011 10:22:19 +0000 jemmapercy http://www.cslondon.org/?p=1572

Artists Impression of Stadium Wrap (Credit: AP Photo/Dow Chemical)

The London Organising Committee of the Olympic Games and Paralympic Games (LOCOG) has confirmed that their Worldwide Olympic Partner, Dow Chemical Company, will be producing a sustainable, fabric ‘wrap’ that will encircle the Olympic Stadium during the Olympic and Paralympic Games.

Shaun McCarthy, Chair of the Commission for a Sustainable London, said “We welcome this addition to the Games experience and the great emphasis that has been placed on sustainability. The combination of light weight low energy design, use of alternatives to PVC and consideration to transportation is impressive. We value re-use over recycling and other forms of waste disposal and will follow up with LOCOG regarding the plans for re-use, to avoid landfill waste and potentially support humanitarian work.”

Further information on London 2012′s annoucement can be found here

]]>
http://www.cslondon.org/2011/08/commission-statement-on-stadium-wrap-announcement/feed/ 0
Stadium rocks http://www.cslondon.org/2009/06/stadium-rocks/ http://www.cslondon.org/2009/06/stadium-rocks/#comments Fri, 05 Jun 2009 14:34:41 +0000 Shaun McCarthy http://www.cslondon.org/?p=106 Read more ]]> I had the privilege of a VIP tour of the Olympic stadium construction site to mark the anniversary of the build phase. It is a very impressive building. The quality of everything from the concrete finish to the cable trays is superb. The design is very smart and minimalist. Only the bare essential materials are used above ground level to ensure the majority of the stadium can be dismantled after the Games. Below ground there are excellent facilities taking shape for athletes, officials and the media.

Designs for the finishing touches are underway including very innovative use of sustainable plastics for the outer wrap and temporary pods to provide catering and merchandising facilities, these are a significant improvement on the tented structures we saw in Beijing.

In common with the velodrome, there is much for the sustainability geek to admire, 15 percent better energy efficiency than building regulations, light, low embodied energy structure and I hope the decision will be made soon to eliminate HFC from the cooling system.

My host pointed out that the London 2012 stadium will do everything the Bird’s Nest did with a quarter of the materials. Unfortunately we were also in sight of the aquatic centre construction which will do everything the Water Cube did with 4 times the materials.

According to veteran stadium rocker Meatloaf, 2 out of 3 ain’t bad. In this context I am not sure I can agree.

]]>
http://www.cslondon.org/2009/06/stadium-rocks/feed/ 0